In 60 seconds: floor area, refrigeration tonnage, build cost, and your annual energy bill. The numbers below update live as you fill in the form. No email required for the result on screen.
Freezer at 0°F runs ~50 BTU/sf·hr load. NJ/NY/PA labor and permitting adds ~10%. Energy estimate assumes 24/7 operation at the national average rate; utility rebates and high-efficiency equipment can drop 15–25%.
Ballpark ±25%. Doesn't include permits, soft costs, real estate, or specialized processing equipment. For an exact number, talk to us.
Email it to me as a PDF — includes:
Boris or Eugene will reach out within 1 business day with your detailed report. If it's urgent, call (201) 256-1231.
Boris or Eugene will run the numbers against your actual site, your actual equipment list, and tell you what's realistic. 30 minutes, no commitment.